BOX CULVERT

Structures Division
Box Culvert Standard Drawings

DRAWING 

STD-15-1 12-07-2001 INDEX OF DRAWINGS AND TERMINOLOGY
STD-15-2 12-07-2001 GENERAL NOTES
STD-15-3 2-28-2003 DESIGN SECTION LIMITS
STD-15-4 12-07-2001 TYPICAL SECTION AND DETAILS
STD-15-5 2-28-2003 TYPICAL ELEVATION
STD-15-6 2-28-2003 CURB AND RAIL DETAILS FOR FILLS UP TO 1’ – 6”
STD-15-7 3-02-2002 CURB AND RAIL DETAILS FOR FILLS GREATER THAN 1’ – 6”
STD-15-8 12-07-2001 INTERIOR WALL END TREATMENTS
STD-15-9 2-28-2003 TYPICAL WINGWALL DETAILS AND NOTES
STD-15-10 NO DATE WINGWALL DIMENSIONS AND QUANTITIES
STD-15-11 NO DATE WINGWALL DIMENSIONS AND QUANTITIES
STD-15-12 2-28-2003 WINGWALL DESIGN SECTION
STD-15-13 NO DATE WINGWALL DESIGN SECTION
STD-15-14 2-28-2003 BACKFILL AND DRAINAGE DETAILS
STD-15-15 NO DATE BACKFILL AND DRAINAGE DETAILS
STD-15-16 12-07-2001 PAVED OUTLET DETAIL

STD-15-16A

  LOW FLOW CHANNEL CONSTRUCTION DETAILS FOR CULVERT INLET AND OUTLET
STD-15-17 NO DATE DEBRIS DEFLECTION WALL
STD-15-18 NO DATE DEBRIS DEFLECTION WALL
STD-15-19 NO DATE SIDEWALK AND MISCELLANEOUS DETAILS
STD-15-20 NO DATE WARPED SLOPE DETAIL
STD-15-21 3-02-2002 PHASE CONSTRUCTION JOINT DETAIL
STD-15-22 2-28-2003 EXTENSION DETAILS
STD-15-23 12-07-2001 EXTENSION DETAILS FOR SCOURED OUTLET
STD-15-24 12-07-2001 END SECTION DETAILS
STD-15-25 NO DATE PRECAST BOX CULVERT DETAILS
STD-15-26 NO DATE PRECAST BOX CULVERT DETAILS
STD-15-27 NO DATE PRECAST BOX CULVERT DETAILS
STD-15-28 NO DATE PRECAST BOX CULVERT DETAILS
STD-15-29 NO DATE PRECAST BOX CULVERT DETAILS

STD-15-30

  STANDARD INTERNAL ENERGY DISSIPATOR FOR BOX AND PIPE CULVERTS
STD-15-35 NO DATE BOX BRIDGE, 1 BARREL AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-36 NO DATE BOX BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-37 NO DATE BOX BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-38 9-19-2006 BOX BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-39 NO DATE BOX BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-40 NO DATE BOX BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-41 NO DATE BOX BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-42 NO DATE BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 5’ – 7’, 0 – 60’ FILL
STD-15-43 NO DATE BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 8’ – 11’, 0 – 60’ FILL
STD-15-44 NO DATE BOX BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 12’ – 14’, 0 – 60’ FILL
STD-15-45 NO DATE BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-46 NO DATE BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-47 NO DATE BOX BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-48 NO DATE BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-49 NO DATE BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-50 NO DATE BOX BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL
STD-15-55 NO DATE BOX BRIDGE, 2 BARRELS AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-56 NO DATE BOX BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-57 NO DATE BOX BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-58 NO DATE BOX BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-59 NO DATE BOX BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-60 NO DATE BOX BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-61 NO DATE BOX BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-62 NO DATE BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 5’ – 7’, 0 – 60’ FILL
STD-15-63 NO DATE BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 8’ – 11’, 0 – 60’ FILL
STD-15-64 NO DATE BOX BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 12’ – 14’, 0 – 60’ FILL
STD-15-65 NO DATE BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-66 NO DATE BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-67 NO DATE BOX BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-68 NO DATE BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-69 NO DATE BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-70 NO DATE BOX BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL
STD-15-75 NO DATE BOX BRIDGE, 3 BARRELS AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-76 NO DATE BOX BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-77 12-07-2001 BOX BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-78 12-07-2001 BOX BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-79 12-07-2001 BOX BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-80 NO DATE BOX BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-81 NO DATE BOX BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-82 NO DATE BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 5’ – 7’, 0 – 60’ FILL
STD-15-83 NO DATE BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 8’ – 11’, 0 – 60’ FILL
STD-15-84 NO DATE BOX BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 12’ – 14’, 0 – 60’ FILL
STD-15-85 NO DATE BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-86 NO DATE BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-87 NO DATE BOX BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-88 NO DATE BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-89 NO DATE BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-90 NO DATE BOX BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL
STD-15-95 NO DATE SLAB BRIDGE, 1 BARREL AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-96 NO DATE SLAB BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-97 NO DATE SLAB BRIDGE, 1 BARREL AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-98 NO DATE SLAB BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-99 2-28-2003 SLAB BRIDGE, 1 BARREL AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-100 2-28-2003 SLAB BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-101 2-28-2003 SLAB BRIDGE, 1 BARREL AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-102 NO DATE SLAB BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 5’ – 9’, 0 – 60’ FILL
STD-15-103 NO DATE SLAB BRIDGE, 1 BARREL AT 14’, CLEAR HTS. 10’ – 14’, 0 – 60’ FILL
STD-15-104 NO DATE SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-105 NO DATE SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-106 NO DATE SLAB BRIDGE, 1 BARREL AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-107 NO DATE SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-108 NO DATE SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-109 NO DATE SLAB BRIDGE, 1 BARREL AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL
STD-15-115 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-116 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-117 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-118 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-119 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-120 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-121 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-122 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 5’ – 7’, 0 – 60’ FILL
STD-15-123 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 8’ – 11’, 0 – 60’ FILL
STD-15-124 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 14’, CLEAR HTS. 12’ – 14’, 0 – 60’ FILL
STD-15-125 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-126 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-127 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-128 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-129 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-130 2-28-2003 SLAB BRIDGE, 2 BARRELS AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL
STD-15-135 NO DATE SLAB BRIDGE, 3 BARRELS AT 6’, CLEAR HTS. 3’ – 6’, 0 – 60’ FILL
STD-15-136 NO DATE SLAB BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 3’ – 4’, 0 – 60’ FILL
STD-15-137 NO DATE SLAB BRIDGE, 3 BARRELS AT 8’, CLEAR HTS. 5’ – 8’,  0 – 60’ FILL
STD-15-138 NO DATE SLAB BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 4’ – 6’, 0 – 60’ FILL
STD-15-139 NO DATE SLAB BRIDGE, 3 BARRELS AT 10’, CLEAR HTS. 7’ – 10’, 0 – 60’ FILL
STD-15-140 NO DATE SLAB BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 4’ – 7’, 0  TO 60’ FILL
STD-15-141 NO DATE SLAB BRIDGE, 3 BARRELS AT 12’, CLEAR HTS. 8’ – 12’, 0 – 60’ FILL
STD-15-142 NO DATE SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 5’ – 7’, 0 – 60’ FILL
STD-15-143 NO DATE SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 8’ – 11’, 0 – 60’ FILL
STD-15-144 NO DATE SLAB BRIDGE, 3 BARRELS AT 14’, CLEAR HTS. 12’ – 14’, 0 – 60’ FILL
STD-15-145 NO DATE SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-146 NO DATE SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 9’ – 12’, 0 – 60’ FILL
STD-15-147 NO DATE SLAB BRIDGE, 3 BARRELS AT 16’, CLEAR HTS. 13’ – 16’, 0 – 60’ FILL
STD-15-148 12-07-2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 6’ – 8’, 0 – 60’ FILL
STD-15-149 12-07-2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 9’ – 13’, 0 – 60’ FILL
STD-15-150 12-07-2001 SLAB BRIDGE, 3 BARRELS AT 18’, CLEAR HTS. 14’ – 18’, 0 – 60’ FILL

 

Bridge Standard Drawings – Box Culverts 

 

 
 

For Lettings After June 2004

The Double and Triple Box Culvert standard Microstation drawings are combined into one drawing.  The drawings for left advance, right advance and square are contained within one drawing file and one reference file.  To display the standard sheet that best fits your bridge, open the reference files dialog box.  You may then view the selection by using the reference file view option.  Also the Box Culvert standard drawing are supplied with dual units (English and Metric).  To view a metric file turn off the reference level 45 and to view an English file turn off the reference level 46.  If you need further assistance, please view the Readme section.

 

Box Culverts (Reference File) box_dbl_tri_ref

DGN

Guard Rail Attachment Details (Reference File) box_guard_rail

DGN

Precast Option For Box Extensions (Reference File) Box_15_Precast_option_for_Box_Extensions

DGN

Optional Culvert Wing Concrete Removal For Box Extensions Box_16_Optional_Culvert_Wing_Concrete_Removal

DGN

Double Cell Culverts

Description

Reference Name

PDF Format

Double Box Culvert With Straight Wings – Square box01_dbl_sq_str
Double Box Culvert With Straight Wings – Left Advance box02_dbl_la_str
Double Box Culvert With Straight Wings – Right Advance box03_dbl_ra_str
Double Box Culvert With Flared Wings – Square box04_dbl_sq_fla
Double Box Culvert With Flared Wings – Left Advance box05_dbl_la_fla
Double Box Culvert With Straight Wings – Left Advance box5A_dbl_la_str English
Double Box Culvert With Flared Wings – Right Advance box06_dbl_ra_fla
Double Box Culvert With Straight Wings – Right Advance box6A_dbl_ra_str English

Triple Cell Culverts

Description Reference Name

PDF Format

Triple Box Culvert With Straight Wings – Square box07_tri_sq_str
Triple Box Culvert With Straight Wings – Left Advance box08_tri_la_str
Triple Box Culvert With Straight Wings – Left Advance Square box8A_tri_la_sq_str English
Triple Box Culvert With Straight Wings – Right Advance box09_tri_ra_str
Triple Box Culvert With Flared Wings – Square box10_tri_sq_fla
Triple Box Culvert With Flared Wings – Left Advance box11_tri_la_fla
Triple Box Culvert With Flared Wings – Right Advance box12_tri_ra_fla
Triple Box Culvert With Straight Wings – Right Advance box12A_tri_ra_str English

Guard Rail Attachment Details

Description

Reference Name

PDF Format

Guard rail for top slab greater than 9″- Resin Anchor System box13_guard_rail

English

Guard rail for top slab less than 9″ – bolts thru slab with bottom plate box14_guard_rail

English

Precast Culvert Extension Option Details

Description

Reference Name

PDF Format

Precast Option For Box Extensions Box_15_Precast_option_for_Box_Extensions

English

Optional Culvert Wing Concrete Removal For Box Extensions Box_16_Optional_Culvert_Wing_Concrete_Removal

English

 

 
Practical Design
Box Culverts (Reference File) box_dbl_tri_ref_PD

DGN

Double Cell Culverts

Description

Reference Name

PDF Format

Double Box Culvert With Straight Wings – Square box01PD_dbl_sq_str
Double Box Culvert With Straight Wings – Left Advance box02PD_dbl_la_str
Double Box Culvert With Straight Wings – Right Advance box03PD_dbl_ra_str
Double Box Culvert With Flared Wings – Square box04PD_dbl_sq_fla
Double Box Culvert With Flared Wings – Left Advance box05PD_dbl_la_fla
Double Box Culvert With Straight Wings – Left Advance box5APD_dbl_la_str
Double Box Culvert With Flared Wings – Right Advance box06PD_dbl_ra_fla
Double Box Culvert With Straight Wings – Right Advance box6APD_dbl_ra_str

Triple Cell Culverts

Description Reference Name

PDF Format

Triple Box Culvert With Straight Wings – Square box07PD_tri_sq_str
Triple Box Culvert With Straight Wings – Left Advance box08PD_tri_la_str
Triple Box Culvert With Straight Wings – Left Advance Square box8APD_tri_la_sq_str
Triple Box Culvert With Straight Wings – Right Advance box09PD_tri_ra_str
Triple Box Culvert With Flared Wings – Square box10PD_tri_sq_fla
Triple Box Culvert With Flared Wings – Left Advance box11PD_tri_la_fla
Triple Box Culvert With Flared Wings – Right Advance box12PD_tri_ra_fla
Triple Box Culvert With Straight Wings – Right Advance box12APD_tri_ra_str

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

 

  REVISION
DATE

DESCRIPTION

«

Tinggalkan Balasan